HILTON ANATOLE PHASE 3 RENOVATIONS - DALLAS TX
PARKWAY CONSTRUCTION
2201 North Stemmons Freeway in Dallas, TX 75207
August 3, 2026
5PM CDT
The Scope of this phase of the project focuses on the complete renovation of the following areas:
. CounteroAer Gourmet Market (To be converted to “Junction”) . Trinity Ballroom and Prefunction (Including Art Corridor and Rotunda)
. Trinity Restrooms (3 sets)
. West Wing (Cortez, Coronado, De La salle, & Desoto)
. West Wing Restrooms (2 sets)
. Gossip Bar Interior Renovation
The scope is fully defined in the documents provided. In summary, it is comprised of, but not limited to, the
following:
. Junction Scope
o Demolition of existing bar and back of house kitchen area
o Reconfiguration of existing bar die wall and equipment
o Reconfiguration of existing back of house kitchen area
o New location of coAee bar
o New metal framing and gypsum board
o Reconfiguration of existing electrical, plumbing, and mechanical systems
o New coAee, kitchen and bar equipment
o Reconfiguration of fire sprinklers
o Reconfiguration of fire alarm devices
o New Finishes
. Trinity Meeting Space and Prefunction Scope
o New floor, wall, and ceiling finishes
o Retrofitting existing lighting
o Replace acoustical ceiling tiles
o Repair damaged floors, walls, and ceiling where required
o New folding wall partition in trinity ballroom
o Replace electrical devices and face plates o New ceiling felt baAle system with structural support in the trinity ballroom
o Remove existing pendant lighting and replace with new in the trinity ballroom
o Reconfiguration of existing mechanical units to install new dropped gypsum board ceiling or soAits in the trinity
ballroom & prefunction space
o Removal of existing pendant lighting and installation of new lighting in the trinity ballroom & prefunction space.
o Rework of existing fire sprinklers and fire alarm devices
. Trinity restrooms Scope (3 sets)
o Reconfiguration of plumbing fixtures and framing to meet current accessibility requirements.
o New floor, wall, and ceiling finishes
o New ceiling lighting
o New lit vanity mirrors
o Relocation of existing mechanical duct work
o New cast iron rough plumbing
o New copper water lines
o Removal of 2 existing sinks at the men’s prefunction restroom
o Addition of 1 urinal and 1 lavatory in the men’s prefunction restroom
o Removal of 4 sinks in the women’s prefunction restroom
o Rework of existing fire sprinklers and fire alarm devices
o Removal of 1 existing lavatory at the men’s and women’s exhibit hall restroom A and B
. West Wing Restrooms Scope
o Reconfiguration of plumbing fixtures and framing to meet current accessibility requirements.
o New floor, wall, and ceiling finishes
o New ceiling framing
o New ceiling lighting
o New lit vanity mirrors
o New wall sconces
o Relocation of existing mechanical duct work
o New cast iron rough plumbing
o New copper water lines
o Addition of 3 water closets in the women’s west wing B restrooms.
. West Wing Corridor & Meeting Space Scope
o New floor, wall, and ceiling finishes
o Relamping existing lighting
o Replaced damaged ceiling tiles
o Repair damaged ceiling tiles
o Repair damaged floors, walls, and ceiling where required
o Remove and Replace folding partition wall panel finish
o Demolish existing wall sconces in the Coronado ballroom
. Gossip Bar Interior Renovation
o Demolition of existing bar and back of house kitchen area.
o Reconfiguration of existing bar die wall and equipment
o Reconfiguration of existing back of house kitchen area
o New metal framing and gypsum board
o Reconfiguration of existing electrical, plumbing, and mechanical systems.
o New kitchen and bar equipment
o New finishes
. Other
o Protection. Contractor will be responsible for an allowance for protection of completed and crossover areas during
construction. (Include as necessary)
? Please include wall separation between areas under construction and those accessed by guests as shown in the
links below:
. https://www.sunbeltrentals.com/equipment-rental/temporary-containment-walls/temporary-wall-systems/
. https://tempwallsystems.com/locations/north-dallas/