RECONSTRUCTION OF LANGFORD STREET - CLINT TX
ATKINS REALIS
LANGFORD RD / SAN ELIZARIO TX
June 10, 2025
2PM MDT
Clint CDV23-0436 – Bid Advertisement
1. Insurance, Bonds and Move-In Relates Expenses, Not to Exceed 5%
2. Remove and Dispose of Existing Asphalt Pavement
3. 2” HMA TY D
4. 6” Flexible Base
5. Prime Coat
6. Traffic Control
7. Earthwork/ Prep. Surface
8. Concrete Header Curb
9. Saw/Cut, Remove and Dispose of Existing Concrete
10. Furnish and Install Reflective Pavement Marking
11. Storm Water Pollution Prevention Plan
12. Match Existing Water Valves/Manhole Elevations